23rd August at 1724hrs,
The traffic signals are all out, and the cross-over is going to be closed, at the junction of Kew Bridge & Chiswick High Road.
Routes affected: 65, 237, 267
65 - Towards Kingston - From Kew Bridge Road at junction of Chiswick High Road, L Chiswick High Road, circumnavigate Chiswick Roundabout, A Chiswick High Road, L Kew Bridge, LOR
237, 267 - Towards Hounslow, Fulwell - From Chiswick Roundabout at junction of A4, 3rd exit A4, L Ealing Road, R Brentford High Street, LOR.
Diversion Reference D93839
Source: TfL Surface Control Centre
The traffic signals are all out, and the cross-over is going to be closed, at the junction of Kew Bridge & Chiswick High Road.
Routes affected: 65, 237, 267
65 - Towards Kingston - From Kew Bridge Road at junction of Chiswick High Road, L Chiswick High Road, circumnavigate Chiswick Roundabout, A Chiswick High Road, L Kew Bridge, LOR
237, 267 - Towards Hounslow, Fulwell - From Chiswick Roundabout at junction of A4, 3rd exit A4, L Ealing Road, R Brentford High Street, LOR.
Diversion Reference D93839
Source: TfL Surface Control Centre